Water spills over the Baldwin Lake dam in Berea, Ohio this dark, misty, December morning. The title? I was listening to the song, Angel, by Sarah McLachlan as I edited this image using GIMP.
Uncategorized
Back on Monday the morning was foggy, lending a wonderful soft mood to the landscape. I took a little drive that day hoping to find interesting scenes and wound up in a Cleveland Metroparks area. I continued my travels that day and headed south and into the rolling countryside. One of my favorite areas presented itself in a wholly different way from how I am accustomed to seeing it. A farmer’s grazing field showed off a pair of naked trees silhouetted against a featureless sky, foreground of colorful weeds and grasses and background veiled in fog. A weathered barn I love to look at was also set off by deep red-brown dead weeds made more colorful by heavy dew. It was a good morning to slow down and look around.
Today was the final work day on our kitchen remodel — time for grout. The guys from A&G arrived on time (as usual) and set straight to work. There were some adjustments to be made to cabinets, and door stops added to save the cabinet doors from damage if opened too far, one replacement door from Kraftmaid was installed but another arrived without provision for hinges! But the focus was on tile and grout: John mixed while Dan tidied up the cabinetry. Then Dan started in applying grout with John following, not far behind, wet-wiping the tiles, smoothing the grout lines. Then there was more wet-wiping followed by dry wiping, and dry wiping, and more dry wiping.
The transformation was fascinating to watch. By 2:00 they had finished, cleaned up, and packed up. We exchanged pleasantries and hand-shakes and they were — literally — heading off to the next job. We will have a bit more dry wiping to do but the kitchen is, essentially, complete and lovely, and ready for years of enjoyment. And, at long last, we get to move back into our living room!
Posting this, I’m unsure about how to number the project day. The A&G guys were only here half a day but it’s a full step forward in the project. I’ll call it Day 9 1/2 but it really feels “bigger” because the tile backsplash was put up this day. Dan and John efficiently worked together spreading the tile adhesive, fitting the pieces, and pressing the glass tiles into place. What a difference! This particular tile is hard to describe: it has a matte finish, a warm tone, but looks quite different under different lighting conditions and at different angles. Application of the grout will finish the tiling and the kitchen project, and that’s due Friday. Right now, however, we can really comprehend how the kitchen will look and it’s looking mighty good!
The guys from A&G arrived bright and early and immediately set about multiple operations in our house. Dan installed electrical outlets flanking our kitchen range, John started in on moulding, and Al assisted with moulding and installation of the final cabinet unit. That last unit was second only in size, I think, to the pantry … it’s the appliance garage with two-door cabinet above, and all one piece! Al and Dan slid it from its huge shipping carton, prepped it for installation, and slid it into place. Once fastened into position the garage/cabinet completed installation of the new kitchen cabinet suite. The garage was last because it had to wait for installation of the countertop — it sits directly upon it! The garage door has a wonderful, tensioned, parallelogram action meaning one pulls out and up to open it and the door rises parallel to the upper cabinets and does not swing out. The mechanism prevents slams both during opening and closing and is brilliantly designed!
Dan installed all of the bar-pull style handles on the cabinet doors and drawers. The hardware is solid stainless and has a soft finish, just reflective enough to pick up color from the surrounding wood. Interestingly, we think the handles are a beautiful accent to the design complimenting the cabinets without calling much attention to themselves.
Outside of the kitchen, trim and shoe moulding were added, completing the flooring project. Most of the moulding went up rapidly but there were those bothersome little spaces that needed a lot of measurement and attention. The finished product really looks great but, where it meets the original woodwork, calls attention to the fact that the old stuff is just too, well, ordinary. We’re also gonna need to repaint all of the walls. {ugh}
If the shipment comes in as promised this evening, the kitchen will see backsplash tile put into place. There will be one day of waiting as the tile adhesive sets. On Friday, the tile is to receive grout. The tile will really finish the project and, for the first time since we’ve lived in this place, the kitchen will have beautiful walls and will practically be a showplace.
I had the morning off from remodeling house-sitting and the day began with beautiful fog hanging over the landscape. I thought one of the Cleveland Metroparks areas might be beautiful draped in fog but as I descended into the valley, the fog thinned! What remained of the fog, however, contributed to wonderfully soft light and the pervasive moisture deepened the colors of plants and earth. Along the way I came across a tree of unusual bark: patches of bark were scaling off, leaving smooth areas of variegated color behind. I have seen trees of this species many times before and the scaling bark appears to be normal and healthy; the day, however, made the appearance all the lovelier. I gathered a number of nice images from areas near the tree and a drive to the south produced some great stuff that I’ll share later. This tree of unusual bark and beauty, however, is my surprise favorite of the day.
It’s getting hard to continue the project’s numbering scheme. After the first week, many of the work days have not been contiguous and sometimes not entire days. So today’s “day” number is somewhat arbitrary. I don’t really care because, whatever day it is, plumbing was connected in the kitchen!
For the first time since the project began we have a fully-functional kitchen. Al, of A&G Home Improvement, came in with his associate Dan to connect our plumbing and we are most appreciative of their Saturday afternoon efforts!
With the new countertop in place and the sink installed, the two attached the garbage disposal, drain pipes, the wonderful new faucet, and connected the dish washer. Everything’s working now — hurrah! We can stop using paper and plastic dishes, won’t dry our hands washing, and can cook real food. Al & Co. will return on Tuesday to install the trim moulding for the new floors, the one remaining cabinet unit, and on Wednesday will put up the glass tile backsplash. Once grouted (next Friday) the project should be complete! Now the condo will be worth way more than we could possibly sell it for. These improvements, however, are for us.
Sorry! No pictures today but what was done, while it was good work, is largely that “invisible” stuff that counts for so much but wasn’t very photogenic.
I was driving through the Portage County (Ohio) countryside this afternoon enjoying the late-autumn scenery. The muted tones of black and brown remind me of the art of watercolorists as I gaze at woodlands and fields. The sun broke through nondescript clouds during the day but, as the afternoon progressed, heavier, more dramatic clouds rapidly moved in; their ragged edges surrounding and tearing at the blue openings to a deeper sky. Some of that change in the weather took place as I watched and photographed from the side of a country road and the final stages took place as I drove westward on the Ohio Turnpike at 70 MPH — camera protruding from an open window!
We’ll call Thursday, November 29, “Day 8” though there has been a period of inactivity that — given our living circumstances — probably ought to be added to the day-ticker! We won’t gripe too much, however, as the Cambria countertop arrived and was installed. Installation was quite a process. We have three countertop areas: two flank the kitchen range, and one forms an ell around the far corner of the kitchen and holds the sink. The two smaller finished pieces were, essentially, just brought into the house by the installers, set in place, and adhered to the tops of the cabinets. The ell, however, was another matter. The main expanse of Cambria arrived in two pieces with one solid piece running across the far end of the room, the other covers the right-hand base cabinets; the two butt on a miter. Cambria is heavy stuff looking and feeling like polished granite.
The two men of the installation crew muscled the first piece into place then, with the first piece tilted up slightly to allow the tight fit, eased in the larger section and lowered both to the cabinet tops.
They used a special vacuum-secured device (as seen on TV) to, first, create a gap along the mitered ends. Then they added a bit of adhesive and used the vacuum machine (it looked like some sort of brain transplant device from a cheap sci-fi movie) to press the pieces together and hold them tight as the adhesive cured. The installer adjusted for level and repeatedly felt along the seam to assure the surfaces matched perfectly as possible.
While the joining was taking place, the crew ran a bead of silicone adhesive along the underside of the countertop where the Cambria rested on the base cabinets. Special color-matched material was pushed into the space where the ends of the countertop touched cabinet walls. The big, dark-colored sink was raised from inside the base cabinet, adhesive added, then wooden braces installed to secure it in its subsurface-mount position.
I’m leaving out a bunch of steps that made this a good installation; it was fairly intense. The process took a couple of hours and the results are splendid, though the place smelled like a chemical plant: resin and adhesive odors were so strong I opened the house to 37-degree (F) air to stop my eyes from watering!
Funny thing: the cabinets look great, the countertop looks great, why am I not thinking the whole thing looks great? Ah! Whereas the cardboard we had covered the base cabinets with was crude, the Cambria is perfect and that draws attention to the terrible walls! Backsplash tile cannot come too soon, though we’ll have to wait til Wednesday!






















